Tag Archives: Candu Owners Group

Uncategorized

CNS Call for Papers

The Conference
The Canadian Nuclear Society will be holding its 8th International Conference on Simulation Methods in Nuclear Science and Engineering in Ottawa, Ontario, Canada, October 9-11, 2018 (Tue -Thu).

Objective of the Conference
The objective of the Conference is to provide an international forum for discussion and exchange of information, results and views amongst scientists and engineers working in the various fields of nuclear science and engineering.

Topics of interest
The scope of the Conference covers all aspects of nuclear science and engineering, modelling and simulation, including, but not limited to:

  • Reactor Physics
  • Thermalhydraulics
  • Safety Analysis
  • Fuel and Fuel Channel Analysis
  • Computer Codes and Modelling
  • Verification &Validation of Computer Codes
  • Best-Estimate and Probabilistic Safety Analysis
  • Sensitivity and Uncertainty Analysis
  • Monte Carlo and its Applications
  • Operation Support
  • Simulation for Fusion Energy Applications
  • Advanced Reactors & Advanced Fuel Cycles
  • Irradiated-Fuel, Proliferation Resistance
  • Plant Refurbishment and Commissioning

Courses, Workshops and Tours (preliminary):
Tour to Chalk River Nuclear Laboratories (Fri 12) Workshops on DRAGON and SERPENT (Tue 9)

Important dates and deadlines
Full-paper submission: 2018 May 1
Notification of acceptance: 2018 July 1
Final paper submission: 2018 September 1

Local Organising Committee
Executive Chair: Adriaan Buijs, McMaster University
Technical Program Chair: Eleodor Nichita, University of Ontario Institute of Technology
Plenary Program Chair: Wei Shen, CANDU Owners Group
Assistant Executive Chair: Ben Rouben, 12&1 Consulting
Treasurer: Mohamed Younis, Retired (formerly AECL)

Conference Secretariat (All Inquiries):
CNS Office: cns-snc@on.aibn.com
Tel.: +1 416-977-7620

Guidelines for Submission of Papers:
Submissions should present facts that are new and significant or represent a state-of-the-art review.
Submit full papers to: https://www.softconf.com/h/8icsmnse.
The template can be found here and on the conference website.

For more information please visit: http://cns-snc.ca/events/8icsmnse/

Uncategorized

OPG’s Pickering Unit 6 First in Canada to Exceed 210,000 EFPH

By Jerry Cuttler
President
Cuttler & Associates Inc.

The August issue of the CANDU Owners Group (COG) newsletter features the following story about a very important COG achievement for the Canadian nuclear industry. It’s about extending by almost 18% the operating lives of the Pickering reactors. Because of their lower power rating (540 MWe), the economic case to re-tube these reactors is weaker than the case for the Bruce and Darlington reactors. This COG achievement strengthens the economics of these reactors and of all the other CANDU reactors worldwide. And it’s about providing more low-cost, reliable, pollution-free electricity for the people of Ontario.

Technical information about Pickering fuel channel fitness for service is available here.

Pickering
Pickering nuclear power plant.

OPG’s Pickering Unit 6 first in Canada to exceed 210,000 EFPH

Ontario Power Generation’s Pickering Unit 6 was rapidly approaching its design limit of 210,000 equivalent full power hours (EFPH), the point at which specifications would indicate it be shut down for refurbishment.

But in 2009, OPG, together with industry partners, including COG, had launched the Fuel Channel Life Management Joint Project to examine evidence that the operating life could be significantly extended. So OPG applied to the Canadian Nuclear Safety Commission for permission to increase that EFPH limit. Receiving the commission’s go-ahead was contingent upon satisfying a number of criteria and clearing a key licensing hold point that Pickering would not operate its pressure tubes beyond 210,000 EFPH until approved by the commission.

“OPG (in partnership with Bruce Power) made a significant presentation to the commission on all the work that had been carried out to demonstrate the high level of confidence that we have in the continued safety and operability of our fuel channels,” said Paul Spekkens, vice president, science and technology at OPG.

Based on results, the presentation, which took place at a public hearing on May 7, 2014, was a resounding success. Less than a month later on June 3, a decision had been reached. Spekkens announced that the commission had accepted OPG’s request to clear the hold point, and Pickering 6 was on track to become the first Canadian unit to operate beyond the 210,000 EFPH limit—up to 247,000 EFPH. It’s a decision that has huge positive implications for OPG’s bottom line, and raises the possibility of similar extensions—and savings—for other CANDU owners/operators.

“Most of this work was carried out by the staff of your organizations as part of the COG Joint Project on Fuel Channel Life Management and as direct technical support to OPG,” said Spekkens in an e-mail announcing the CNSC’s positive decision to the project partners.

“I would like to convey OPG’s appreciation for all the hard work carried out on our behalf by your organizations. The results of these efforts formed the basis for the compelling case we were able to present to the CNSC. Thank you to all who were involved.”